Customer service 10-21, Sun. 10-19 67 555 888

Shopping cart

Product cart is empty

Back

Phone (Mon.-Fri. 10-19):  67 555 888
Mandatory Field

This functionality can be used by accepting the terms of our use of performance cookies

product
WFQP7012EVM Hisense, 7 kg, depth 39 cm, 1200 rpm - Front Load Washing Machine https://www.euronics.lv/en/home-appliances/washers-and-dryers/front-load-washers/wfqp7012evm/hisense-7-kg-depth-39-cm-1200-rpm-front-load-washing-machine https://www.euronics.lv/UserFiles/Products/Images/328117-493530.avif OutOfStock 269.99 EUR

Hisense, 7 kg, depth 39 cm, 1200 rpm - Front Load Washing Machine

Specifications
Hisense, 7 kg, depth 39 cm, 1200 rpm - Front Load Washing Machine
  • Hisense, 7 kg, depth 39 cm, 1200 rpm - Front Load Washing Machine
  • Hisense, 7 kg, depth 39 cm, 1200 rpm - Front Load Washing Machine
  • Hisense, 7 kg, depth 39 cm, 1200 rpm - Front Load Washing Machine
  • Hisense, 7 kg, depth 39 cm, 1200 rpm - Front Load Washing Machine

Hisense, 7 kg, depth 39 cm, 1200 rpm - Front Load Washing Machine

Product code: WFQP7012EVM Brand: Hisense
269.99 €
(17)

• Automatic recognition of laundry weight
• Steam function
• Lockable control panel
• Delay end

Read more

Similar product

Shipping methods Select the preferred shipping method in checkout

Specifications

  • Washing machine

    installation type free-standing
    energy class C
    energy consumption 59 kWh/100 cycles
    max. load capacity 7 kg
    program length
    208 min.
    water consumption per cycle 42 L
    spin speed 1200 rpm
    spin performance class B
    noise level (washing) / (spin-drying) 74 dB
    airborne acoustical noise emission rating B
  • Functions

    general washing programs rinse + centrifuge, cotton, wool, mix, no spin, rinse, centrifuge, cotton eco
    special washing programs sportswear, quick wash, prewash, dark wash, duvet, steam update, tub clean, allergy resistant
    additional washing programs baby steam care
    systems inverter motor
    functions delay end
    additional functions Automatic recognition of laundry weight, water level sensor
  • General Parameter

    produced China
    display Yes
    washing machine type front-loader
    panel language english
    manufacturer Hisense
    colour white
    number of the regulation 2019/2014
  • Dimensions

    width 59.5 cm
    height 84.5 cm
    depth 39 cm
    weight
    59 kg
    total depth
    45 cm
  • Package dimensions

    width 49.5 cm
    height 88 cm
    depth 65 cm
    weight
    59 kg

Reviews

Average rating

(17)

4.5

5
12
4
3
3
1
2
0
1
1

Only users who have made a purchase can rate the product.

When submitting a review, please follow the rules. Read more about leaving a review here.

    • Euronics customer!

      11/9/2026 6:59 PM

    • Euronics customer!

      9/11/2024 10:03 AM

    • Euronics customer!

      7/2/2024 9:45 AM

    • Euronics customer!

      6/20/2024 11:42 AM

    • Euronics customer!

      5/27/2024 4:59 PM

    • Oleksandr

      12/6/2023 12:54 PM

      A normal washing machine, it does its job.

      Нормальная стиралка, свою функцию выполняет.

    • Euronics customer!

      11/10/2023 10:36 AM

      Falls a little short of premium machines

      Немного не дотягивает до идеала

    • Euronics customer!

      9/5/2023 9:20 AM

Energy label